ITT 465L 전략항공지휘통제시스템

ITT 465L Strategic Air Command Control System
Offutt AFB 핵 벙커와 3월 AFB; SACCS는 각각 데이터 처리 센터(DPC), 데이터 디스플레이 시스템(DDS), 데이터 전송 서브시스템([1]DTS)이 있는 3개의 AN/FSQ-31 시스템을 가지고 있었다. The DCS consisted of an Encryption/Decryption Subsystem, High Speed Data Transmission Equipment (Modems), and an Electronic Data Transmission Control Center (EDTCC) with secure voice units and Technical Control Consoles (TCCs)--SACCS "voice transmission [was] by patching 4-wire telephone terminating equipment on the circuit at each end.[1]NORAD의 1963년 치들로 빌딩 복합운영센터, 1966년 샤이엔 산단(왼쪽 위)이 SAC 데이터를 받았다(예: SAC 폭격기 리콜을 위한 NORAD 레이더 방송국을 통한 메시지 중계 허용).

1965년에 RCC는 13개의 "운영 기지 지휘소"("단순 주문 사이트"가 있는 4개의 RCC를 제외하고 다른 EDTCC에서 이중화됨)에 있었고, SRCC는 2개의 "미사일 사이트 대체 지휘소"에 있었다. 즉, RCCs/SRCCs는 "결함 및 설비 제어판"을 가지고 있었다. One Offutt EDTCC communicated with 1 SRCC and 6 RCCs (with 2 circuits to the 1 local RCC), while the other Offutt EDTCC only had circuits to 4 RCCs (2 bomber, 2 ICBM). At the Numbered Air Force bases, circuits from one EDTCC were to 7 RCCs, and the other connected to 5 RCCs and 1 missile SRCC.[1]
심팩

시스템 개발 주식회사(SDC)는 또한 "명령/제어 인력소, 시뮬레이션 SACCS 하드웨어 출력물 생산 능력...벽 디스플레이[및 SIMFAC 직원이 SIM에 필요한 조치를 수행하는 방음 관측 데크[부스]를 사용하여 SAC 명령 포스트를 모델링하기 위해 SIMFAC(Simulation Facility)를 구축했다.인텔리전스 구축에서 위협 대응의 변화까지 모든 외부 발생을 집계한다."--[2]50 ft × 35 ft (15 m × 11 m) "격리 부스"는 국제 전기 회사에 의해 1962년에 완성되었다.[3]

ITT 465L 전략항공지휘통제시스템(SACCS, SAC Control System, 465L Project,[1] 465L Program)은 전략항공사령부 "전투항공기, 급유탱크, [and] 탄도미사일"의 지휘·통제를 위한 컴퓨터와 통신시스템의 냉전 '빅 L'[4] 네트워크였다.[3] 인터내셔널 전화와 텔레그래프는 프로젝트 465의 주요 계약자였으며,[5] SACCS는 오프트 AFB, 3월 AFB, & Barksdale AFB의 지휘소들 사이에 "크로스 텔 링크"를 가지고 있었다(SACCS 또한 샤이엔 산단지와 공군 지휘소들과 통신했다. The 465L System included IBM AN/FSQ-31 SAC Data Processing Systems, Remote (RCC) and Simplex Remote Communication Systems (SRCC), SAC Network Control Office, "4-wire, Schedule 4, Type 4B alternate voice-data operation", and one-way communication with "ICBM launch control centers"[1] (the SAC Digital Network upgraded to two-way communications.) "Super SAGE형 컴퓨터"를 위한 IBM 외에도, 6개의 직접 하청업체[5] 중 또 다른 곳은 AT&T(통신 회로의 종단간 제어)였다.[1]

배경

전략공군사령부는 1946년에 텔레포닉 아미 사령부와 행정망(ACAN)을 사용하기 시작하여 1949년 USAF AIRCOMNET "명령 텔레타입 네트워크"로 전환하기 전까지(전화와 텔레타입이 있는 독립 전략작전통제시스템 또는 SOCS는 "1950년 5월 1일까지 완전 설치되었다").[6]: 77 SACE는 1958년 일상 전화 시스템, 텔레타이프 시스템, SSB HF 시스템 및 1차 경보 시스템[7] 갖춘 전 세계 통신 네트워크를 구축했다.-"SAC 지하 지휘소와 그 모든 부하 지휘통제소(번호 공군과 날개 지휘소) 사이의 직통 전화 시스템이다."[8]

1차 IBM "Big L" 시스템
In 1955 the Experimental SAGE Subsector was completed with a simplex IBM XD-1 prototype of the AN/FSQ-7 planned for the SAGE computer network,[9] and IBM Federal Systems subsequently built dozens of vacuum tube computers for the AN/FSQ-8 and AN/FSQ-7 centrals of Support System 416L (SS-416L),[10] the 1st "Big L" system. SAGE 레이더 스테이션은 데이터 전송을 위해 AN/FST-2 세트를 사용했으며, GATR 사이트와 BOMARC 지상 대 공중 송신기 시설은 지상 제어 요격용 무선 제어를 제공했다. 1958년[11] 6월 IBM AN/FSQ-32 트랜지스터 SAGE 센트럴이 발표되었고 NORAD 핵 벙커 여러 곳에서 계획되었지만 1964년에 슈퍼 전투 센터가 취소되었다. 트랜지스터 중심은 "ARPA 명령-제어 R&D 프로그램에 사용되도록 SDC에 제공"되었고 USAF는[when?] "ADEPT…상태 보고 시스템"[12]을 위해 SDC에서 SAC HQ at Omaha로 [Q-32]를 회수했다.

1956년 CINCSAC[13] SAC의 임대 텔레프린터(텔레타이프) 회로와 무선 연결이 너무 느리다고 판단했고,[14][failed verification] SAC는 1957년부터 컴퓨터를 사용하기 시작했다.[15] SAC 연락팀은 1958년 2월 1일부터 NORAD 사령부에 위치했으며, 두 사령부는 SAC 기지와 방공 방향 센터를 연결해야 한다는 데 합의하였다.[16] CONAD가 1956년까지 미국 북서부, 몬타나-북다코타 지역, 그리고 가장 큰 지역인 미네소타에서 뉴멕시코, 북부[17] 플로리다까지 거의 삼각형에 가까운 "남중부 지역"을 3개 지정하면서, CONAD는 1956년까지 "SAC 기지 단지" (지리적 지역)를 지정했다.NORAD의 경보 네트워크 번호 1은 1958년 7월 1일, 1957년 SAC벙커를 네트워크의 29개 송신/수신 스테이션 중 하나로 하여 운용되었다.[18]

개발

1958년 2월 11일, USAF 본부는 SACCS[19](Westover AFB 지휘소는 컴퓨터 시스템을 얻는 것이었다)[5]에 대한 GOR 168 또는 GOR 168을 발표하였고, 4월 1일, HQ USAF는 SACCS 지정자를 프로그램 133L에서 465L로 변경하였다.[20] 1958년 9월 13일 국가 생존 통신 시스템(NSCS)에 대한 SAC의 QOR가 발행되었고,[7]: 175 1959년 10월 시스템 비용은 1억3970만 달러에서 12개월 만에 3억3980만 달러로 증가했다. 국방장관실은 "465L 전체 개념의 타당성에 대한 우려"로 12월 1일까지 프로그램을 삭감했다.[7] 9월 1960년에는"는 전략 공군사 표시 장치 경보 시스템의 설치"(예를 들어, 탄도 미사일 조기 경계망 디스플레이 정보 처리 장치(딥)은 오펏 bunker[7]에:3게임기 218과 12월 7일 I960에 465L 프로그램으로 인하되었다 등""a 가장 엄격한 approach"[7](금욕적인 방공 구역 또한 기존에 북미 방공사 곧 계획된 작은 BUIC 속임수이다.trol 체제m.) "1961년 7월 국방부는 SACCS 465L를 프리스트라이크 시스템으로 재연결하고, 공기와 지상 요소를 갖춘 별도의 [공중기동식] 사후 지휘통제 시스템을 구축했다.[7]

1962년까지 "해외 및 입주기지를 포함한 SAC 설치는 85로 정점을 찍었다."[21] "100만 회선이 넘는 SACCS(SAC Control System) 프로젝트 465L는 SAGE 코드의 4배 크기에 도달했고 1,400만 년의 프로그래밍을 소비했다. SDC는 특히 이 프로젝트를 위해 주요 컴퓨터 언어인 JOPLITY를 개발했다."[4]

SACCS는 "1965년 3월 도급업자에 의해 전략항공사령부에 인도되었다"[15]면서 핵공격에서 살아남고 지리적으로 분리된 SAC의 군대의 지휘와 통제를 지원하기 위한 정보의 신속한 전송, 처리 및 표시를 위해 설계되었다.[14] 1968년 1월 1일, SACCS는 작전 능력을[22] 획득했다(Offutt와 3월의 정비는 각 55 전략 중대와 33 통신[23] 중대가 담당했다). NORAD의 핵 벙커 건설 중, SAC가 1965년부터 시작한 콜로라도의 딥 언더그라운드 커맨드 센터 건설 계획이 취소되었다.

1968년, "3월 중에 SAC가 시험을 완료한 후, AFSC위성 통신을 위해 LES-6와 함께 사용하기 위한 SAC 단말의 수정을 주선했다".[24] 1968년 7월 12일에 완성된 SACCS 원격 통신 승합차는[specify] SACADVON을 지원하기 위해 [25] 앤더슨 AFB로 운송되었다(예: 1965년 2월 17일에 베트남 전쟁을 위해 SAC B-52 30대가 괌에 배치되었다).[26]

점진적 교체

1975년 10월 6일, SACCS는 IBM 4020 군사용 컴퓨터Honeywell 6080 컴퓨터로 교체되었을 때 Worldwide Military Command and Control System과 공식적으로 통합되었다(FSQ-31 부품 보유는 11월에 완전히 해체되었다).[citation needed] Offutt는 "1977년 초기 WWMCCS Intercomputer Network"의 일부가 되었다(1981년까지 20개 사이트).[27] 1977년 계획은 SACCS를 ITT[28] SAC 자동화된 정보 네트워크(SATIN IV)로 대체하는 것이었다. "전혀 새로운 명령 및 제어 시스템"[29] (ITT는 실바니아에 대한 최초의 SATIN IV 계약을 따냈다.)[30]

교체된 DTS

샤틴 4세 대신에, 구조 조정 계획 전략 공군 지휘 통제 시스템"데이터 전송 서브 시스템과 데이터 디스플레이 서브 시스템의 일부"[31일]예를 대체할. 11월 5일 1986년에 마틴 매리에 타 공사 기술자 91차 전략 미사일 윙에 전략 공군사 디지털 네트워크(전략 공군사 디지털 정보망)장비 설치 시작된 전략 공군 사령부 디지털 정보 네트워크 구축했다. 놓치다ile 발사 제어 센터[32]([33]즉, HUTE 랙 또는 MBCP 랙). 2월 20일 1987년에,"전략 공군사 예술의 전당은 디지털 네트워클 때[그것]성공적으로 본부 전략 공군사 사령부 센터에 남겨 전략 정찰 Wing사령부, 둘 다 오펏 공군 기지, 네브라스카에 있는 운영의 초기 작전 능력, 그리고351st 전략 미사일 Wing사령부 화이트 먼 공군, 미주리에서 선언했다."[32]SACDIN은 결국 "135개소를 연결했고, ICBM 발사통제소와 양방향 메시지 통신을 처음으로 허용했다"[32]밝혔고, 지상파 비상망 통신시스템은 1987년 9월 최종 환경영향평가서를 발표했다.[34]

1988년 5월 6일, "소프트웨어는 3대의 후방 공격 사령부관제 항공기에 운용되어 공통 공중 발사 관제 센터가 피스키퍼와 미니트맨 미사일을 충분히 발사할 수 있게 되었다."[32]

SAC 자동 명령 및 제어 시스템

465L 시스템이 몇 년 동안 "SAC Auto Cmd/Ctl Sys"[35]로 완전히 대체되었을 때, SAC C2 시스템은 (USTRATCOM 명령 및 제어(PE 0101316F)의 SACCS 데이터 처리 시스템 제외)의 일부로 그 이름을 계속 사용하였다.[36] By 1995, the "emergency war order (EWO) communication systems consist[ed] of the primary alert system (PAS), SAC digital network (SACDIN), survivable low frequency communication system (SLFCS), Air Force satellite communications system (AFSATCOM), [ICBM] Super High Frequency Satellite Terminal (ISST) and [UHF] voice radio communication systems"[33] USTRATCOM SACCS는 tbd\[specify]에 동일한 약자로 Strategic Automated Command and Control System을 재설계하였으며[when?], 2011년까지 원자력 명령 및 제어 시스템에서 최소 필수 비상 통신 네트워크가 현대화되었다.[37] By February 2012, USSTRATCOM was using the Integrated Strategic Planning and Analysis Network (ISPAN), and the USSTRATCOM Replacement Facility Fit-Out (PE 0303255F) was to "include secure HEMP-Shielded Command and Control Center, mainframe computer data centers, multiple 24/7 mission operations centers, storage and maintenance areas, labs/workrooms,[38] 백업 발전기, 무정전 전원, 기술 제어 시설, FY13부터 [자금 지원]을 개시한다.

참조

  1. ^ Jump up to: a b c d e f "Strategic Air Command Control System (SACCS): Description and Service Maintenance", Private Line Data Systems: Special Data Networks, Plant Series, American Telephone and Telegraph Company, July 1965, Section 314-411-504 (SACCS Description and Service Maintenance section), retrieved 2014-05-12, This section covers description, administrative procedures and maintenance requirements for the Strategic Air Command Control System (SACCS). This system was initially known as the 465L Project. … The customer may use the circuits for voice transmission when desired by patching 4-wire telephone terminating equipment on the circuit at each end. Signaling equipment is added with the telephone set at EDTCCS. Circuits from EDTCCS terminating at RCCS and SRCCS are provided with signal receiving equipment A 1600 cps tone is used for signaling from an EDTCC. No means of signaling is provided from an RCC or SRCC to an EDTCC. … Circuits which interconnect headquarters locations with operational bases and missile complexes or other headquarters locations… Over-all administration of these circuits is handled by the SAC Network Control Office. [cf. SAC Communications Control] … An RCC is the customer’s data equipment location at an operational base command post. RCCS are normally connected by data circuits to two different EDTCCS.
  2. ^ Antaccs 프로젝트(미드웨이 보고서)(보고서).7월 1964년.2014-04-02 Retrieved."전략 공군 사령부 제어 시스템(전략 공군 지휘 통제 시스템)프로젝트의 설계와 개발 책임을 지지하기 위하여, 사회 간접 자본 퍼래, 뉴저지의 시뮬레이션 시설(SIMFAC)을 설립했다.예술의 전당은 지하 사령부의 SIMFAC인 육체적인 모델 Command/Control 인사 방송국과 완전한,capabil ities 모의 전략 공군 지휘 통제 시스템 하드웨어 자료와 벽 디스플레이를 생산해야 한다.예전에는 SIMFAC 직원 행동들은 외부 사건들은 Intell igence력 증강 위협 대응의 변화에부터 모의 실험하기 위해 필요한 공연을 방음 장치가 되어 있는 전망대가 있다.(text-only 복사본archive.org).에서 이용할 수
  3. ^ Jump up to: a b "tbd" (NewspaperArchive.com character recognition text). European Stars and Stripes. March 3, 1962. Retrieved 2014-05-09. Nearly $413,000 was contribute.*:by military and civilian personnel!!in the European area. … Data Displays Being Tested In SAC Booth PARAMUS, N.J. (Special) — On«rof the world's largest "isolation*booths" is being used here toequipment and man's mentalers in handling the forecast,lem of keeping track of the Strate*gic Air Comd battle forcevarious simulated combattions. •'•'?.Built by International Electric;?Corp., a subsidiary of International;Telephone and Telegraph Cbrp.^;the booth incorporates two-way;mirrors, hidden microphones and,tape recorders. '-jFifty-feet long and 35-feet wlde,-^the booth is called Simfac (for":simulation facility) and is to J>eused in connection with a proposedworking model of a new SAC com-mand control system developedhere by IEC.Known as SACCS, the command,control system will be a fully auto-mated, electronic computer net-work which will keep tab on SAC'*combat aircraft, refueling tankers,ballistic missiles and 270,000 memAlso, It will display up-to-the-'minute, force status on 16 wall-sizeprojection screens at commandheadquarters.StatisticsThe problem is one of matingman's capability to that of a ma-chine.That is, how much visually-dis-played information can SAC con-trollers absorb at one time; howfast can they find a specific num-ber of 20, 40. or 50; do colored dis-plays help or hinder them, andwill the staff operate less efficient-ly if given too much data at onetime?These and other questions arebeing studied by IEC psychologists* rhuman engineers and researchers^in the closely controlled laboratoryconditions of Simfac.(필요한 경우)
  4. ^ Jump up to: a b Edwards, Paul N (1997). "SAGE". The Closed World: Computers and the Politics of Discourse in Cold War America. ISBN 9780262550284. Retrieved 2014-05-14. SAGE--Air Force project 416L--became the pattern for at least twenty-five other major military command-control systems… These were the so-called "Big L" systems [and] included 425L, the NORAD system; 438L, the Air Force Intelligence Data Handling System; and 474L, the Ballistic Missile Early Warning System (BMEWS).
  5. ^ Jump up to: a b c "New Applications: Command Control System -- Project 465L" (PDF). Computers and Automation. 10 -- No. 12. August 1964. Retrieved 2020-09-05. The system makes a 70mm positive film of the information. Three images of each message appear on the film, and a powerful beam of light carries them about 30 feet to the screen. Before striking the film, however, the light beam is split into the three primary colors by special mirrors. Combining these colors, gives the display system a color code of seven distinct colors for easy recognition of various types of information. The complete cycle, from display request to projected image, requires less than 15 seconds. … Data Processing Central (DPC) , Project 465L, Prototype Equipment located at the ITT Data and Information Systems Division test facility. … Display equipment will be installed at Offutt AFB; March AFB, Calif.; Westover AFB, Mass.; and Barksdale AFB, La.; any of the four will be able to serve as a fully equipped SAC central headquarters at any time. … As late as 1957, the first widely accepted programming system, FORTRAN, was released for the IBM 704.
  6. ^ Wainstein, L. (June 1975). The Evolution of U.S. Strategic Command and Control and Warning: Part One (1945-1953) (Report). Study S-467. Institute for Defense Analyses. pp. 1–138.
  7. ^ Jump up to: a b c d e f Moriarty, J. K. (June 1975). The Evolution of U.S. Strategic Command and Control and Warning: Part Two (1954-1960) (Report). Study S-467. Institute for Defense Analyses. pp. 139–266.
  8. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2014-05-18. Retrieved 2014-10-02.CS1 maint: 제목(링크)으로 보관된 복사본 "첫 번째 중 하나는 SAC 통신 시스템이고 [sic] 현재 SACCS(Strategic Automated Command and Control System)… 원래 네브라스카에 기반을 둔 블루 스카우트 미사일을 탑재한 279L 시스템과 이후 수정된 미니트맨 II 미사일을 탑재한 시스템은 미사일 탑재 구역에 UHF 송신기를 사용했다. 그것은 비상 로켓 통신 시스템 (ERCS)으로 알려지게 되었다. …비행대 또는 비행대대의 미사일 무선통신시스템(MRCS) 기지 책임도 LCC 간에 주기적으로 통과되었다."
  9. ^ "Vigilance and Vacuum Tubes: The SAGE System 1956-63" (SAGE Talk Transcript). Ed-Thelen.org. 1998. Retrieved 2013-02-16. the Whirlwind computer, which was a digital version of the ASCA, was about five million dollars, in 1950’s [sic] dollars … For the 1949 fiscal year, MIT requested 1.5 million dollars for the Whirlwind project. … one [SAGE computer] was at Lincoln Lab, …the XD-1, and the other one was at Kingston, the XD-2. So we used both those sites for development. … The XD-1 was a simplex system…not duplex … the original vacuum-tube computers—the last one was finally taken down in 1983, still operating. … IBM got…about 500 million dollars…to build the 56 computers.
  10. ^ "Designations Of U.S. Air Force Projects".
  11. ^ Schaffel, Kenneth (1991). Emerging Shield: The Air Force and the Evolution of Continental Air Defense 1945-1960 (45MB pdf). General Histories (Report). Office of Air Force History. ISBN 0-912799-60-9. Retrieved 2011-09-26.
  12. ^ http://www.dod.mil/pubs/foi/Science_and_Technology/DARPA/301.pdf "ADDPT는 거의 자연어에 가까운 컴퓨터 명령을 받아들였고, 초기에는 시간 공유 IBM 360/67 이상에서 다른 컴퓨터에서도 작동할 수 있었다. ADEPT는 보안을 위한 특별 규정을 통합했고, 1968년부터는 한동안 국가지휘센터(NCC)와 공군지휘센터에서 사용되었다. SAC는 또한 상태 보고 시스템을 위해 ADEPT를 사용했으며,시스템을 위해 나중에 SDC에서 SAC HQ로 Q-32 컴퓨터를 다시 가져갔다고 말했다.39
  13. ^ "Strategic Automated Command Control System". Global Security.org. Retrieved 2014-05-13. In 1956, Gen. Curtis LeMay, commander-in-chief of SAC, saw a need for improving SAC's command and control system. A coordinated effort was undertaken by government and industry to provide this system. The project was designated 465L, and was the predecessor to the current Strategic Automated Command Control System network. In the mid-1960s, SAC procured the 465L system
  14. ^ Jump up to: a b "Strategic Automated Command Control System". Federation of American Scientists. 1999. Retrieved 2006-06-20.
  15. ^ Jump up to: a b Wohlman, John (1968). "Computer-Generated Map Data: An Aid to Command and Control" (webpage transcript). Air University Review. Retrieved June 20, 2006. Cite 저널은 필요로 한다. journal= (도움말)
  16. ^ 서문:
  17. ^ Maloney, Sean M. (1 January 2007). Learning to Love the Bomb: Canada's Nuclear Weapons During the Cold War. Potomac Books, Inc. ISBN 9781574886160 – via Google Books.
  18. ^ 서문:
  19. ^ 전략항공사령부 : "SAC 통신시스템 연구", 1958년 2월 6일
  20. ^ 이는 SAC 통신 시스템 연구 인용에 따라 "Ivid"[where?]를 사용한 것으로 인용되었다.
  21. ^ Weitze, Karen J. (November 1999). Cold War Infrastructure for Strategic Air Command: The Bomber Mission (PDF) (Report). United States Army Corps of Engineers. Retrieved 2013-08-15.
  22. ^ 전략항공사령부 1968년 1월~[full citation needed]6월
  23. ^ http://airforcehistoryindex.org/data/000/247/171.xml
  24. ^ The Air Force in Space Fiscal Year 1968, Part I (PDF) (Report). October 1970.
  25. ^ 공군역사연구기관: "3902d 공군기지 날개, 1968년 7월 - 9월" 페이지 40[full citation needed]
  26. ^ Worden, Col Mike (July 2000) [March 1998]. Rise of the Fighter Generals: The Problem of Air Force Leadership 1945–1982 (Report). Air University Press. p. 174. ISBN 1-58566-048-5. Retrieved 2013-08-30.
  27. ^ "ALERT" (PDF).
  28. ^ https://www.gao.gov/products/464949 웨이백 머신에 2016-11-28 보관
  29. ^ Currie, Dr. Malcolm R (18 January 1977). The Department of Defense Program of Research, Development, Test and Evaluation, FY 1978 (Report to the Congress). p. V-5 (pdf 239).
  30. ^ United States General Accounting Office (1979). Decisions of the Comptroller General of the United States, Volume 57. Washington, DC: U.S. Government Printing Office. p. 737.
  31. ^ "전략통신부서에 직접 보고하는 하부조직의 역사" 1982년 1월 1일 - 12월 31일, 41권 4호
  32. ^ Jump up to: a b c d Clark, Major Rita F (1 May 1990). SAC Missile Chronology 1939–1988 (PDF) (Report). Office of the Historian, HQ. SAC, Offutt AFB. Retrieved 2013-09-26. 1958…1 January Headquarters SAC established the Office of Assistant CINCSAC (SAC MIKE) at Inglewood, California. This position was designated to serve as an extenstion of Headquarters SAC and was responsible for working closely with the Air Force Ballistic Missile Division … 1966…17 April The first attempted launch of a Minuteman II ICBM by means of the Airborne Launch Control System (ALCS)
  33. ^ Jump up to: a b Technical Manual, Operation Instructions, Communication and Ancillary Equipment, USAF ICBM Systems, 21 Nov 1995, Section 1 (PDF) (Technical Order), Change 14 identifies SLFCS, AFSAT II, etc., retrieved 2014-05-12, The single SACDIN cabinet at PLCCs is the communications processor set (HUTE rack). … SAC Digital Network System
  34. ^ Council, National Research; Studies, Division on Earth Life; Sciences, Commission on Life; Research, Board on Radiation Effects; (Gwen), Committee on Assessment of the Possible Health Effects of Ground Wave Emergency Network (1993). Introduction - Assessment of the Possible Health Effects of Ground Wave Emergency Network - The National Academies Press. doi:10.17226/2046. ISBN 978-0-309-04777-7. PMID 24967486.
  35. ^ Hutzler, Patricia L. (April 1990). Defense Planning and Programming Categories: A Special Tool for Special Needs (PDF) (Report). Volume 3. Appendix E, Proposed Expanded DPPC Structure. Logistics Management Institute. Retrieved 2014-05-18. volume= 추가 텍스트(도움말)
  36. ^ http://www.brookings.edu/fp/projects/nucwcost/definitions/010131606.htm
  37. ^ http://www.dtic.mil/descriptivesum/Y2013/AirForce/stamped/0303131F_7_PB_2013.pdf
  38. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2014-11-27. Retrieved 2014-05-18.CS1 maint: 제목으로 보관된 복사본(링크)