This is a good article. Click here for more information.

86번가 역(BMT 4번가 선)

86th Street station (BMT Fourth Avenue Line)
동일로86번길
"R" train
MTA NYC logo.svg 뉴욕시 지하철역(급행철도)
86th Street - Platform.jpg
역 승강장
측점 통계량
주소동일로86번길
뉴욕 브루클린, 11209[1]
자치구브루클린
로캘베이 리지
좌표40°37′22″N 74°01′42″w/40.62278°N 74.02833°W/ 40.62278; -74.02833좌표: 40°37′22″N 74°01′42″W / 40.62278°N 74.02833°W / 40.62278; -74.028333
나누기B(BMT)[2]
라인BMT 4번가 선
서비스 R(항상)
트랜짓Bus transport 뉴욕시내버스: B1, B16, S53, S79 SBS, S93; B37(3번가); B63(5번가)[3]
구조지하
플랫폼1섬 플랫폼
트랙스2
다른 정보
열린1916년 1월 15일 (106년 전) (1916-01-15)[4]
스테이션 코드038[6]
접근 가능This station is compliant with the Americans with Disabilities Act of 1990 ADA 액세스 가능
반대-
방향
전근시키다
이전/기타 이름86번가 - 베이 리지[5]
교통
20193,434,888[7] Decrease1%
순위424점[7] 만점에 145점
역승계
다음 북쪽77번가:R
다음 남쪽베이 리지-95번가: R
위치
86th Street station (BMT Fourth Avenue Line) is located in New York City Subway
86th Street station (BMT Fourth Avenue Line)
86th Street station (BMT Fourth Avenue Line) is located in New York City
86th Street station (BMT Fourth Avenue Line)
86th Street station (BMT Fourth Avenue Line) is located in New York
86th Street station (BMT Fourth Avenue Line)
트랙 레이아웃

스트리트 맵

스테이션 서비스 범례
기호 설명
Stops all times 항상 중지

86번가 역 브루클린 베이 리지 86번가와 4번가에 위치한 뉴욕시 지하철 BMT 4번가 선이다.항상 R열차가 운행한다.

86번가 역은 4번가 선의 일부로 건설되었다.당초플랫폼 2개를 갖춘 4트랙 급행역으로 계획됐지만 결국 서부 승강장과 선로만 건설됐다.86번가가 포함된 노선 구간 공사는 1913년에 착공하여 1915년에 완공되었다. 역은 1916년 1월 15일, 59번가에서 86번가까지 BMT 4번가 선의 연장선의 일환으로 개통되었다.역의 승강장은 1926~1927년에 연장되었고, 1970년대와 2000년대 후반에 다시 보수되었다.86번가 역은 2018년부터 2020년 사이에 보수되었고, 엘리베이터가 추가되어 1990년 미국 장애인법을 준수하게 되었다.

86번가 역은 몇몇 뉴욕교통 버스 노선의 버스 거점과 터미널 역할을 한다.

역사

시공 및 개구부

86번가 역은 4번가 선의 일부로 건설되었다.이 노선 계획은 당초 1905년 6월 1일에 채택된 뒤 1906년 6월 18일 뉴욕 대법원의 상소부로부터 예정 노선을 따라 재산 소유자의 필요한 동의를 얻지 못해 승인을 받았다.[8]급행운행위원회는 1907년 7월 1일 뉴욕주 공공서비스위원회(PSC)가 계승하였으며, PSC는 1907년 10월과 11월에 노선계획을 승인하였다.[9][10]

뉴욕시와 브루클린 고속철도회사(BRT), 인터버러 고속철도회사(Interborough Rapid Transit Company)의 도시 교통망 확대를 위한 협상의 일환으로 이 노선은 BRT의 자회사에 임대되었다.이중계약의 계약4로 알려진 이 계약은 1913년 3월 19일에 체결되었다.[9]1912년, 듀얼 시스템 협상에서, 86번가 역 바로 남쪽에 있는 43번가에서 89번가까지 4번가 전철 연장 공사를 권고했다.이 권고안은 1912년 2월 15일 추정위원회로부터 승인되었다.PSC는 수석 엔지니어에게 1912년 6월 14일 계획을 세우라고 지시했다.연장 두 계약인 11B번 국도는 1912년 9월 16일 데그논 건설회사에 총 380만 달러(2020년 1억190만 달러 상당)에 낙찰되었다.[9]

1913년 1월 24일 이 역이 포함되고 61번가와 89번가 사이에 걸쳐 있는 11B2번 국도에 공사가 시작되었다.이 구간은 1915년에 완공되었다.[8]86번가는 1916년 1월 15일 BMT 4번가 노선을 59번가에서 86번가로 연장하는 일환으로 개통되었다.[4][11]이 역은 1925년 10월 25일 베이 리지-95번가까지 남하하는 원스톱 연장선이 개통되기 전까지 이 노선의[12] 원래 터미널이었다.[13]

스테이션 리노베이션

1920년대

1922년 6월 27일, 뉴욕 주 교통 위원회는 기술자들에게 BRT의 후임인 브루클린-맨해튼 트랜짓 코퍼레이션(BMT)의 23개 역에서 8량 열차를 수용하기 위한 연장 계획을 준비하라고 지시했다.이 프로젝트의 일환으로 베이 리지 애비뉴의 플랫폼은 495피트(151m)에서 530피트(160m)까지 연장되었을 것이다.[14][15]뉴욕시 교통위원회(NYCBOT)가 기술자들에게 4번가 노선을 따라 11개의 다른 역과 이것의 플랫폼을 연장하는 계획을 준비하라고 지시했을 때인 1925년 2월 16일에야 연장에 대한 진전이 이루어졌다.사업비는 63만3000달러(2020년 934만1254달러)로 추산했다.BMT는 1923년 9월부터 교통위원회로부터 이러한 플랫폼을 늘리라는 명령을 받았다.[16]NYCBOT는 1926년 2월 25일에 이 프로젝트의 입찰서를 받았다.[17]이 계약은 코르손 건설회사에 34만5021달러(2020년 504만3662달러 상당)에 낙찰됐다.[18]연장은 1927년 8월 1일에 개통되었다.[19]

1970년 역 남단 승강장 증축 위치

1960년대

1960년대 뉴욕시 교통국(NYCTA)은 10량 열차를 수용할 수 있도록 브루클린 남부 노선의 역 플랫폼을 615피트(187m)까지 늘리는 프로젝트를 시작했다.[20]NYCTA는 1967년 7월 14일 플랫폼 연장 건설(2020년 5만1109달러 상당)에 대비해 Bay Ridge Avenue를 포함한 4번가 선내 11개 역에서 6585달러(2020년 5만1109달러 상당)에 W. M. Walsh Corporation에 시험 보링 실시 계약을 체결하였다.[21]NYCTA는 1968년 5월 3일 이 역을 포함한 45번가 역베이 리지~95번가 사이에 있는 4번가 선의 역에서 승강장을 확장하는 사업에 대한 입찰 초대를 발표했다.[22]

그러나, 1968년 2월 플랫폼 확장 프로젝트에 대한 작업은 이미 시작되어 있었다.보수공사의 일환으로 역 승강장은 남쪽으로 85피트(26m) 연장되었고,[20][23][24] 역의 정교한 모자이크 타일 벽은 철거되었다.BMT 브로드웨이와 4번가 선의 다른 15개 역에도 행해진 후자의 변화는 비인간적이라는 비판을 받았다.NYCTA 대변인은 오래된 타일의 상태가 좋지 않다고 말했다.게다가, 그것은 늙은 모자이크들이 "훌륭한 예술적 장점"[25]을 가지고 있다고 생각하지 않았다.

고장난 R열차처럼 타일링된 새 벽의 경치가 역을 지나간다.

2010년대

2007년 당시 13대 지역구였던 비토 포셀라 하원의원과 22대 주 상원의원 마티 골든은 2011년 완공된 1,380만 달러의 리노베이션 자금을 확보했다.개보수는 계단을 수리하고, 역의 환기를 다시 만들었으며, 벽과 바닥은 물론 플랫폼 가장자리를 따라 ADA 준수 노란색 안전 디딤판을 새로 설치했다.승강장 벽은 원래 타일로 되어 있었으나 1970년 보수공사 때 철거되었다.현대식 개보수는 이 타일을 복원했고, 베이 리지 인근 지역의 오래된 집에서 영감을 얻은 "환승용 유리 모자이크 예술"을 추가했다.[26][27][28]광역교통공단(MTA)의 2010~2014년 자본계획의 일환으로, 5가 가장 높은 5점 만점으로 3.5등급 이하의 부품집중도가 높은 역을 5점 만점으로 개보수하는 데 초점을 맞춘 25개 역 갱신 프로그램에 대한 자금후원이 제공되었다.이 역의 부품 중 33%가 3.5등급 이하인 것으로 나타났다.[29]2010~2014년 MTA 캐피털 프로그램에서는 뉴욕시 교통장애인위원회가 95번가 역을 95번가 역 중 하나로 대체할 것을 요청하여 1990년 미국 장애인법에 따른 접근성 가이드라인을 완벽하게 준수하도록 하기 위해 역 리모델링 설계에 자금을 지원하였다.ADA에 접속할 수 있도록 만들 필요가 있는 100개의 주요 [30][31][32]방송국프로젝트 건설에 대한 자금 지원은 2015-2019 MTA Capital Program에서 제공되었다.[33]

그 일환으로 엘리베이터 2대가 추가되었는데, 하나는 메자닌에서 플랫폼으로, 다른 하나는 메자닌에서 메자닌에서 도로로 86번가와 4번가 동남쪽 모퉁이에 있었다.[34]역의 85번가 입구에는 엘리베이터를 설치하지 않기로 결정되었는데, 그 입구는 적당한 깊이에 있지 않고, 그 입구는 사람이 다니지 않았기 때문이다.보도 엘리베이터를 위한 충분한 공간을 제공하고, 계단을 넓힐 수 있도록 하며, 보도 아래 하수구 주변에서 작업할 수 있도록 보도 전구를 설치하였다.[35][36][37]전구 차단제는 또한 교통체증을 일으키지 않고도 버스가 정차할 수 있게 해준다.[38]엘리베이터 건설을 위해 4번가에서 차선을 철거하기로 한 결정은 보행자들에게 안전하지 않을 것이라고 믿는 지역 주민 이사회 회원들로부터 비난을 받았다.[39]메자닌에서 엘리베이터를 위한 공간을 마련하기 위해 승강장으로 가는 두 개의 계단이 이전되었고, 그 사이에 엘리베이터와 그 계단으로 통하는 새로운 경사로가 위치하였다.[35][40]승강장에 새로 생긴 계단 중 하나를 위한 공간을 마련하기 위해 역의 오랜 판매업자는 2017년 2월 임대차 계약을 상실했다.[37][41]

프로젝트의 일환으로 메자닌에서 4번가와 86번가의 남서쪽 모퉁이에 두 번째 계단이 추가되었다.[37]메자닌의 장비와 승무원실은 ADA 호환 직원용 화장실과 라커룸을 설치하는 등 엘리베이터를 위한 기계 및 전기 인프라를 수용할 수 있도록 재구성되었다.또한, 역무원 부스를 휠체어 친화적인 높이로 개조하고 난간, 개찰구, 플랫폼 패널, 점자 표시장치, 전동 관문을 재구성하여 완전한 접근성을 제공하였다.[42]프로젝트의 일환으로 새로운 예술작품과 모자이크 밴드도 설치되었다.[38]그 프로젝트의 일환으로, 새로운 지도들이 시험 삼아 역 벽에 붙여졌다.[43]이 프로젝트의 일환으로 방송국의 통신 시스템도 업그레이드되었다.[44]MTA는 2017년 가을 예비 입찰자들에게 프로젝트 계약을 공개했다.[45]2017년 12월 엘솔체인지에 1,790만 달러 규모의 계약이 성사됐다.[42]

엘리베이터 공사는 2018년[42] 6월 시작돼 2020년 5월 말 완공될 예정이었다.[46]그러나, 뉴욕시의 COVID-19 대유행으로 인한 자원 부족 때문에, 완성은 2020년 7월 29일로 미뤄졌다.[47][48]이 프로젝트의 최종 비용은 36,055,077 달러였다.[46]

측점 배치도

G 거리 수준 출구/출입구
B1 메자닌 요금 관리, 역무원
Disabled access4번가와 86번가 남동쪽 모퉁이 엘리베이터
B2
플랫폼 레벨
북행 71번가 방향 (화이트홀가 늦은 밤) (77번가)
섬 플랫폼 Disabled access
남부행 95번가(테르미너스) 방향 →

이 지하역에는 2개의 선로와 1개의 섬 승강장이 있다.[49]R은 항상 여기서 멈춘다.[50]

위의 플랫폼과 메자닌은 짙은 녹색 기둥을 가지고 있으며, 대체 기둥에는 "86 스트리트"[51][52]라고 쓰여진 흰색 글자가 있는 표준 검은색 역명판이 있다.선로 벽은 2011년 정거장 보수공사의 일환으로 모자이크 타일링이 복원되었다.[53][51]역의 남쪽 구간은 1970년 승강장이 확장된 곳으로, 터널 벤치월을 증축하는 대신 벽을 따라 모자이크 장식이나 타일이 없다.[23]그 플랫폼에는 모자이크 트림 라인이 있는 여러 가지 직원 시설들이 있다.[54]

충당금

이 역은 59번가 남쪽의 급행 선로를 연장할 수 있는 계획 때문에 4번가의 서쪽에 지어졌다.[55]승강장은 이 역의 북쪽에 있는 두 개의 남행 선로 사이에 위치하고 있으며, 현재 남행 선로는 승강장 주위로 흔들리며 북행 선로는 직진하고 있다.[49]추가로 2개의 트랙은 4번가 동쪽에 세워졌을 것이다.[4][55][8]이 네 개의 선로는 비록 터널이 건설되지 않았지만, 급행 서비스가 필요했을 Staten Island 터널을 용이하게 하기 위해 주로 계획되었다.[56][57]게다가, 메자닌에는 현재 직원들만을 위해 사용되는 많은 부분이 있다.[55][58]

86번가와 4번가 남서쪽 모퉁이 계단 전경

출구

이 역에는 두 개의 출입구가 있다풀타임은 남쪽 끝에 있다.플랫폼에서 두 개의 계단이 개찰구가 있는 메자닌으로 올라간다.보데가는 엘리베이터를 이용하기 위해 퇴거될 까지 요금 통제 안에 있었다.[41][59][60]요금제외에는 토큰 부스가 있고, 86번가와 4번가 양쪽으로 올라가는 계단 3개가 있으며, 2개는 남서쪽 코너로 이어진다.[37][61][62]엘리베이터가 교차로 동남쪽 모퉁이로 통한다.[37]그 역의 다른 요금 통제 구역은 인원이 부족하다.승강장에서 2개의 계단이 있는데, 그 중 하나는 현재 폐쇄되어 있고,[63] 이 계단은 85번가와 4번가의 남서쪽 모퉁이로 올라가는 2개의 하이엔트/출구 개찰구 2개가 있는 메자닌으로 올라간다.두 메자닌 모두 원래의 모자이크 자르기 선을 가지고 있다.[26][64][65][66]

버스정류장

버스 연결을 보여주는 메자닌의 표지판.

역은 S53 로컬 및 S93 한정 버스와 Staten Island로 가는 S79 선택 버스 서비스를 포함한 몇몇 뉴욕 시 교통 노선들의 버스 허브 및 터미널 역할을 한다.[5][62][67][68]

버스정류장 위치 경로 터미네이터스[67][68]
동일로86번길
동일로4길
SE 코너
B1 맨해튼 비치
오리엔탈 대로와 매켄지 거리
B16 프로스펙트 레퍼츠 가든
프로스펙트파크 지하철역
동일로86번길
동일로4길
NW 코너
B16 해밀턴 요새
해안로4길
동일로4길
상도로87번길
NW 코너
S53 포트리치먼드
포트 리치먼드 터미널
포트 리치먼드 애버뉴와 리치먼드 테라스
S93 스테이튼 섬 대학교
행정 건물
동일로4길
동일로86번길
SE 코너
SBS 79 스태튼아일랜드몰
링 로드[5] 남쪽 마쉬 애비뉴

참조

  1. ^ "Borough of Brooklyn, New York City". Government of New York City. Retrieved April 16, 2020.
  2. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  3. ^ "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
  4. ^ a b c "Subway Running To Eighty-Sixth Street Starts Building Boom In Bay Ridge". The Brooklyn Daily Eagle. January 15, 1916. Retrieved June 29, 2015 – via newspapers.com open access.
  5. ^ a b c "Select Bus Service has arrived on S79". mta.info. Metropolitan Transportation Authority. September 3, 2012. Archived from the original on July 6, 2015. Retrieved July 5, 2015.
  6. ^ "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  7. ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  8. ^ a b c Rogoff, David (May 1961). "The Fourth Ave. Subway". New York Division Bulletin. Electric Railroaders' Association: 2–10. Retrieved May 8, 2017.
  9. ^ a b c Fourth Avenue Subway, Brooklyn's New Transportation Line: A Part of the Dual System of Rapid Transit of the City of New York. New York State Public Service Commission. June 19, 1915. p. 18.
  10. ^ "Fourth Avenue Subway Is Sent To A Committee". The Brooklyn Daily Eagle. March 20, 1908. pp. 1–2. Retrieved May 4, 2017 – via newspapers.com open access.
  11. ^ Report of the Public Service Commission For The First District Of The State of New York For The Year Ending December 31, 1916. Vol. II. Statistics of Transportation Companies For The Year Ending June 30, 1916 Prepared By The Bureau of Statistics and Accounts. 1917.
  12. ^ "Subway Bids Announced: For 95th Street Terminal, Brooklyn, and Corona Yard" (PDF). The New York Times. March 1, 1925. ISSN 0362-4331. Retrieved June 28, 2015.
  13. ^ "95th St. Subway Extension Opened At 2 P. M. Today". The Brooklyn Daily Eagle. October 31, 1925. Retrieved June 29, 2015 – via newspapers.com open access.
  14. ^ Second Annual Report of the Transit Commission (For the Calendar Year 1922). New York State Transit Commission. 1923. p. 100.
  15. ^ Proceedings of the Transit Commission, State of New York Volume III From January 1 to December 31, 1923. New York State Transit Commission. 1923. p. 1277.
  16. ^ "12 B-M. T. Stations To Be Lengthened". The New York Times. February 17, 1925. ISSN 0362-4331. Retrieved May 4, 2017.
  17. ^ "Board Receives Platform Bids For B.M.T. Lines. Six Companies Submit Prices for Extending Subway Stations". The Brooklyn Citizen. February 26, 1926. p. 5. Retrieved April 7, 2020 – via newspapers.com open access.
  18. ^ "Brooklyn Wins Big Improvement Fund". Brooklyn Standard Union. March 18, 1926. p. 20. Retrieved April 7, 2020 – via newspapers.com open access.
  19. ^ "B.M.T. Stations Ready For Eight-Car Trains". Brooklyn Standard Union. August 1, 1927. p. 1. Retrieved April 9, 2020 – via newspapers.com open access.
  20. ^ a b New York City Transit Authority Annual Report For The Year June 30, 1960. New York City Transit Authority. 1960. pp. 16–17.
  21. ^ Minutes and Proceedings. New York City Transit Authority. 1967. pp. 379–380.
  22. ^ Engineering News-record. McGraw-Hill. 1968. p. 75.
  23. ^ a b Dorante, Thomas (September 19, 2018). "Looking towards the far south end of the Bay Ridge-bound track at the 86th Street BMT Fourth Avenue Line station in Bay Ridge, Brooklyn. This is where the station was extended to make it 600 feet, with the brown wall being the former tunnel wall". Wikimedia Commons. Retrieved April 19, 2020.
  24. ^ Rogoff, Dave (February 1969). "BMT Broadway Subway Platform Extensions" (PDF). New York Division Bulletin. Electric Railroaders' Association. 12 (1): 4.
  25. ^ Burks, Edward C. (February 21, 1970). "Subways' Colored Tile Gets Cover‐Up Job". The New York Times. ISSN 0362-4331. Retrieved April 7, 2020.
  26. ^ a b Golden, Martin J. (January 25, 2007). "Congressman Fossella And Senator Golden Announce Agreement For Full Renovation Of The 86th Street Subway Station". nysenate.gov. New York State Senate. Retrieved July 5, 2015.
  27. ^ Golden, Martin J. (September 23, 2008). "Senator Golden Announces Funding For Repairs At 86th Street Station". nysenate.gov. New York State Senate. Retrieved July 5, 2015.
  28. ^ 참조:
  29. ^ "MTA 2010-2014 Capital Program Questions and Answers" (PDF). nysenate.gov. Metropolitan Transportation Authority. Retrieved August 28, 2019.
  30. ^ Transit & Bus Committee Meeting February 2017 (PDF). Metropolitan Transportation Authority. February 18, 2017. p. 198. Archived from the original (PDF) on May 24, 2019. Retrieved July 30, 2020.
  31. ^ "T6041322 ADA Accessibility at 86th Street on the 4th Av Line - Design Only". mta.info. Metropolitan Transportation Authority. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  32. ^ "T6041322 ADA Accessibility at 86th Street on the 4th Av Line - Design Only". mta.info. Metropolitan Transportation Authority. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  33. ^ Katinas, Paula (September 9, 2015). "MTA to build elevator at Bay Ridge's 86th St. station". Brooklyn Daily Eagle. Retrieved July 30, 2020.
  34. ^ Katinas, Paula (February 25, 2013). "Subway riders form alliance to fight for better service in Bay Ridge". Brooklyn Eagle. Retrieved July 5, 2015.
  35. ^ a b "Presentation by the MTA to Brooklyn CB10". heyridge.com. April 2018. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  36. ^ "Presentation by the MTA to Brooklyn CB10". heyridge.com. April 2018. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  37. ^ a b c d e McGoldrick, Meaghan (April 6, 2017). "Board calls foul on elevator coming to 86th Street subway station, cites safety, traffic concerns". Brooklyn Reporter. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  38. ^ a b "MTA Announces Completion of Four ADA-Accessible Stations Coinciding with 30th Anniversary of the Americans with Disabilities Act". mta.info. Metropolitan Transportation Authority. July 27, 2020. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  39. ^ Spivack, Caroline (January 16, 2017). "Planned MTA Elevator Will Cause Car Wrecks, Panel Says". Brooklyn Paper. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  40. ^ McGoldrick, Meaghan (May 2, 2018). "Construction on 86th Street station elevator to start June 1, others on the way". Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  41. ^ a b McGoldrick, Meaghan (February 16, 2017). "Vendor inside 86th Street subway to close by end of month to accommodate coming elevator". Brooklyn Reporter. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  42. ^ a b c "NYCT to Begin Elevator Installation Project at 86 St Station in Bay Ridge". mta.info. Metropolitan Transportation Authority. June 5, 2018. Archived from the original on July 30, 2020. Retrieved June 5, 2018.
  43. ^ "Back in the station, we're also testing something: New maps. Some of our more astute twitter followers already got wind of this, but if you're passing through and have thoughts, tell us what you think here". Twitter. New York City Transit. July 29, 2020. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  44. ^ DeJesus, Jaime. "86th Street elevators ready for liftoff". Brooklyn Reporter. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  45. ^ "Construction/Architectural & Engineering Contract Solicitation Notice/Project Overview" (PDF). mta.info. Metropolitan Transportation Authority. September 21, 2017. Archived (PDF) from the original on July 30, 2020. Retrieved July 30, 2020.
  46. ^ a b "Project Description, Budget and Scope". Metropolitan Transportation Authority. June 5, 2018. Archived from the original on July 29, 2020. Retrieved June 5, 2018.
  47. ^ Capital Program Oversight Committee Meeting June 2020. Metropolitan Transportation Authority. June 2020. p. 27. Archived from the original on July 29, 2020. Retrieved July 29, 2020.
  48. ^ "As of this afternoon the 86 St R station in Brooklyn is fully accessible". Twitter. New York City Transit. July 29, 2020. Archived from the original on July 29, 2020. Retrieved July 29, 2020.
  49. ^ a b Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC 1056711733.
  50. ^ "R Subway Timetable, Effective December 19, 2021" (PDF). Metropolitan Transportation Authority. Retrieved February 3, 2022.
  51. ^ a b Cox, Jeremiah (June 9, 2009). "Looking down the narrow and simple island platform at 86 Street". subwaynut.com. Archived from the original on March 9, 2016. Retrieved April 19, 2020.
  52. ^ Cox, Jeremiah (June 9, 2009). "Looking down the small mezzanine to the full time booth and exit at 86 Street". subwaynut.com. Retrieved April 19, 2020.
  53. ^ Rosenfeld, Robbie (June 12, 2011). "New tile". nycsubway.org. Retrieved April 19, 2020.
  54. ^ Cox, Jeremiah (June 9, 2009). "The only place on the entire platform where there is a trim-line, it's along the top of a small room in the middle of the platform at 86 Street". subwaynut.com. Retrieved April 19, 2020.
  55. ^ a b c "Brooklyn Subway Extension Plan: Fourth Ave. Line to 86th St., Tunnel to Staten Island, and Eventually a Through Route to Coney Island" (PDF). The New York Times. February 16, 1912. Retrieved June 28, 2015.
  56. ^ "To Extend Subway to Fort Hamilton" (PDF). The New York Times. August 26, 1922. ISSN 0362-4331. Retrieved June 27, 2015.
  57. ^ "Three Rapid Transit Contracts are Let" (PDF). The New York Times. December 29, 1922. ISSN 0362-4331. Retrieved June 28, 2015.
  58. ^ Cox, Jeremiah (June 9, 2009). "Looking down the one staircase down to the platform from the unstaffed fare control area to 85 Street". subwaynut.com. Retrieved April 19, 2020.
  59. ^ Whitehorne, Wayne (January 15, 2020). "Mezzanine and shops". nycsubway.org. Retrieved April 19, 2020.
  60. ^ Cox, Jeremiah (June 9, 2009). "One of the two staircases, and the entrance to the largest newsstand I know of in the subway system, on the mezzanine to 86 Street". subwaynut.com. Retrieved April 19, 2020.
  61. ^ Cox, Jeremiah (June 9, 2009). "The narrow mezzanine area outside of fare control at the full-time staffed entrance from 86 Street". subwaynut.com. Retrieved April 19, 2020.
  62. ^ a b "86th Street Neighborhood Map". mta.info. Metropolitan Transportation Authority. 2018. Archived from the original on July 30, 2020. Retrieved July 30, 2020.
  63. ^ Hodurski, Michael (February 21, 2007). "Platform view with closed stairwell". nycsubway.org. Retrieved April 19, 2020.
  64. ^ McGoldrick, Meaghan (November 15, 2019). "Construction at Bay Ridge station rips through historic tile work". Brooklyn Daily Eagle. Archived from the original on June 10, 2020. Retrieved July 30, 2020.
  65. ^ Cox, Jeremiah (June 9, 2009). "The two High Entrance/Exit gates in the small fare control area at the unstaffed entrance to 86 Street from 85 Street". subwaynut.com. Retrieved April 19, 2020.
  66. ^ Cox, Jeremiah (June 9, 2009). "Another view on the tiny mezzanine area of the exit to 85 Street, there is a narrow and closed of staircase down to the platform from it". subwaynut.com. Retrieved April 19, 2020.
  67. ^ a b "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
  68. ^ a b "Staten Island Bus Map" (PDF). Metropolitan Transportation Authority. January 2020. Retrieved December 1, 2020.

외부 링크